A single room usually takes one to two days depending on the size and condition of the ceiling. That includes scraping, smoothing, priming, and painting. Larger areas or ceilings with multiple layers may take a bit longer.
A single room usually takes one to two days depending on the size and condition of the ceiling. That includes scraping, smoothing, priming, and painting. Larger areas or ceilings with multiple layers may take a bit longer.